Design Model of the Tunnel Axis and its Algorithm Implementation

Article Preview

Abstract:

With a large number of construction projects building in urban rail construction, it’s very necessary for researching on the construction axis. Construction axis of the subway is consisted of line segment, circular arc segment and transition curve. The paper introduces design models and algorithms of the tunnel boring machine (TBM) axis (DTA). By analyzing the DTA characteristics of each curve, summing up their general characters, we ultimately make a unified common algorithm and geodetic coordinate calculation model of the design axis in horizontal and vertical planes. It will be very useful for the process of underground construction.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

570-577

Citation:

Online since:

September 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] WU Lun. Geographic Information Systems Principles, Methods and Applications. Beijing: Science Press, 2005, pp.141-164.

Google Scholar

[2] WANG Jinghai. On the Road to Ease Curves (spirals) Parallel to the Line Length of the Solution to the Formula and Its Application in Engineering [J]. Beijing Road, 2001 (1).

Google Scholar

[3] ZHAO Yongping, TANG Yong. Road Survey and Design. Higher Education Press, (2004).

Google Scholar

[4] CAI Lianju. Coordinate Calculation and Loft of the point in the Complex Curve [J]. NON-FERROUS MINING AND METALLURGY, 2005 (3).

Google Scholar

[5] ZHAO Jinhan. The Linear Management in TBM Construction [J]. Construction Technology and Applications, 2005 (1).

Google Scholar

[6] GAO Chunxiang, ZHU Guoli, PAN Minghua & XIONG Jianqiao. The Algorithm of the Tunnel Axis' Deviation Judgement in TBM Construction [J]. Modern Machinery, 2004 (1).

Google Scholar