Study on the Construction Process Control Claims Management

Article Preview

Abstract:

Engineering construction counterclaim occupy a very important position in the construction project cost management, is also a key part in engineering settlement audit. This paper introduces the properties, claim evidence, procedures, cost calculation and management etc. To safeguard the lawful rights and interests of all parties construction, to promote the healthy development of the construction industry.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

385-388

Citation:

Online since:

October 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] ShiSuLan, zhaoyingying, XiJianJiang claims management. Showing construction [J].journal of Hebei, water conservancy, 2008 (3): pp.51-52, in Chinese.

Google Scholar

[2] Engineering construction HeJiangLan claims management [J] the thinking of Guizot university of technology (social science edition), 2007 (12): pp.86-90, in Chinese.

Google Scholar

[3] Engineering construction claim management ZhangFengYing [J].journal of western exploration engineering, 2008 (6): pp.22-24, in Chinese.

Google Scholar

[4] European Environment Agency (EEA) (2003): 2003, Europe's Environment: the Third Assessment. Office for Official Publications of the European. Communities, Luxembourg, p.151–164.

Google Scholar

[5] Franker, P. & Samuelson, L.A. (1989): Produktkalkyler,industry, (Product Estimation in Industry). Mekanförbundets Förlag, Stockholm, Sweden, p.191–193.

Google Scholar

[6] Garden, J. (1995): ABC-kalky leering, (Activity Based Costing). Student litter attar, Lund, Sweden, p.105, (in Swedish).

Google Scholar

[7] Johnson, H.T. & Kaplan, R.S. (1987): Relevance Lost. The Rise and Fall of Management Accounting. Harvard Business School Press, Boston, Maps. 243.

Google Scholar