[1]
S.B. Gershwin. Manufacturing Systems Engineering [M]. Englewood Cliffs: Prentice Hall, (1994).
Google Scholar
[2]
J.S. Li, D.E. Blumenfeld, N.J. Huang and J.M. Adlen, Throughput analysis of production systems: recent advances and future topics, International Journal of Production Research, 47 (2009) 3823-3851.
DOI: 10.1080/00207540701829752
Google Scholar
[3]
K.C. Jeong and Y.D. Kim, Performance analysis of assembly/disassembly systems with unreliable machines and random processin times, IIE Transactions, 30 (1998) 41-45.
DOI: 10.1080/07408179808966436
Google Scholar
[4]
A. Patchong and D. Willaeys, Modeling and analysis of an unreliable of parallel-machine stages, IIE Transactions, 33 (2001) 59-568.
DOI: 10.1080/07408170108936854
Google Scholar
[5]
S. Yang, S.J. Hu. Approximate analysis of production lines with loop, scrapping and serial/parallel blocks[C]/. Second Aegean International Conference on Analysis and Modeling of Manufacturing Systems, Tinos Island, Greece, 17-20 May, (1999).
Google Scholar
[6]
A.C. Diamantidis, C.T. Papadopoulos and M.I. Vidalis, Exact analysis of a discrete material three-station one-buffer merge system with unreliable machines, Int. J. Prod. Res., 42 (2004) 651-675.
DOI: 10.1080/00207540310001602838
Google Scholar
[7]
A.C. Diamantidis, and C.T. Papadopoulos, Markovian analysis of a discrete material manufacturing system with merge operations, operation-dependent and idleness failures, Computer and Industrial Engineering, 50 (2006) 466-487.
DOI: 10.1016/j.cie.2005.04.004
Google Scholar
[8]
A.C. Diamantidis, C.T. Papadopoulos and C. Heavery, Approximate analysis of serial flow lines with multiple parallel-machine stations, IIE Tractions, 39 (2007) 361-375.
DOI: 10.1080/07408170600838423
Google Scholar
[9]
A.C. Diamantidis and C.T. Papadopoulos, Exact analysis of a two-station one-buffer flow line with parallel unreliable machines, European Journal of Operational Research, 197 (2009) 572-580.
DOI: 10.1016/j.ejor.2008.07.004
Google Scholar