Abstract:

The technique of splitting grouting for dams is one of the important technical approaches to improve the inner quality of dam construction. However, the construction cost is too high with the current technological standard, which restricts the further promotion of this technology. Based on the assumption that the other conditions of construction process remained unchanged and by obeying the law of interaction between the placement of grout-hole spacing and the actual anti-seepage effect during splitting grouting, Mohr-Coulomb Hardening constitutive model was adopted in this paper on the basis of large-scale finite element numerical algorithm. Through the fluid-solid coupling computation of grout holes of different spacing, the distribution law of various factors during splitting grouting, such as the pore water pressure generated by seriflux and the stress and strain of dam, was studied first. Next, the mechanism of reinforcement and seepage of splitting grouting seriflux in soil body was revealed, and the influence of this mechanism on the stability of dam body was also investigated. Finally, the effect of splitting grouting was evaluated.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

295-299

Citation:

Online since:

January 2012

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Bai Yongnian, Wu Shining, Wang Hongeng, etc. Reinforcement of Earth-rock Dam. Beijing: Water Conservancy and Hydropower Press, (1992).

Google Scholar

[2] Bai Yongnian. The Outline on the Splitting Grouting Technology. Construction and Management Water Conservancy Project, 2000, 5: 52-53.

Google Scholar

[3] Sun Jianzheng. On the Design and Application of Splitting Grouting in the Anti-seepage of Earth Dam. Guangdong Building Materials, 2008, (7): 12-13.

Google Scholar

[4] Zhao Junhui. Effect Analysis of the Change of Grout Hole Spacing during Splitting Grouting on Earth Dams [J]. Construction Technology, 2007, 36: 256-257.

Google Scholar

[5] Liu Fucheng. Finite element Analysis of Split-grouting on Earth-rock Dam based on Duncan-Chang Model[J]. Electronic Journal of Geotechnical Engineering, 2010, 15: 1737-1746.

Google Scholar

[6] Berndt. M. L. Strength and Permeability of Steel Fibre Reinforced grouts[J]. Construction and Building Materials, 2010, 24(9): 1768-1772.

DOI: 10.1016/j.conbuildmat.2010.02.011

Google Scholar

[7] Wu Ke. Experimental Study and Numerical Analysis of Splitting Grouting on Earth Dam Reinforcement [D]. Jinan: The Master Thesis of ShanDong University, (2004).

Google Scholar

[8] Bransby M. F. & Randolph M. F. Combined Loading of Skirted Foundations[J]. Geotechnique, 1998, 48: 637-655.

DOI: 10.1680/geot.1998.48.5.637

Google Scholar

[9] Frantziskonis G. & Desai C. S. Constitutive Model with Strain Softening[J]. International Journal of Solid Structure, 1987, 23(6): 733-750.

DOI: 10.1016/0020-7683(87)90076-x

Google Scholar

[10] Hibbit, Karlsson & Sorensen. ABAQUS Scripting User's Manual(Version6. 3)[M]. Pawtucket: HKS, (2002).

Google Scholar

[11] Zhong Long & Zhang Mujian. Construction Practice of Splitting Grouting in High Earth Dam Running with High Water-Level[J]. People's Pearl River, 1999, 3: 44-52.

Google Scholar

[12] Xu Zhongfu. Effect Analysis of Anti-seepage and Reinforcement of Shanmei Reservoir Dam[J]. China Water Conservancy, 2010, 29-32.

Google Scholar

[13] Li Cunfa, Tian Zhigang & Yu Yingwu. Grouting Technique in Anti-Seepage and Reinforcement of the Dam of Mahe Reservoir [J]. China National Building Waterproof Association, 2005, 34-35.

Google Scholar

[14] Ma Mingyue, Wu Ke & Bai Yongnian. In-situ Experimental Research on Reinforcement Technology of Splitting Grouting[J]. Water Conservancy Science and Technology and Economy, 2010, 16(5): 487-489.

Google Scholar

[15] Wu Ke & Bai Yongnian & Li Shucai. Application of Splitting Grouting on the Dam Reinforcement[J]. GEDMAR08, 2008, 755-761.

Google Scholar