Calculation & Analysis on Integral Mound-Lifting System of Shear Wall Construction in High-Rise Building

Article Preview

Abstract:

Kingkey building in Shenzhen is a kind of tube in tube structure which consists of outer tube and reinforced concrete core tube. The outer tube is composed of CFST columns. The article introduces the design idea and theory of the whole mould-lifting system during the work progress and analyses the security and global stability of steel platform and support columns in the system during the different construction stages, which is combined with the structure of the core tube and the construction characteristics.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

770-775

Citation:

Online since:

May 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Yanlin Guo, Peng Chang, Haowen Ye, and so on. Self-lifting technology of steel platform in core tube construction of Guangzhou West-tower[J]. Construction Technology, 2007, 36 (6): 65-68. (in Chinese)

Google Scholar

[2] Hongjun Ge, Guanghong Su. Design and application for support frame of lifting formwork system in Guangzhou Pearl River New Town West-tower [J]. Construction Technology, 2009, 38 (12). (in Chinese)

Google Scholar

[3] Leixin Jiang, Yanlin Guo, Xuewu Liu. Analysis of internal forces during the construction of Guangzhou Pearl River New Town West-tower[J]. Construction Technology, 2008, 37 (5): 9212. (in Chinese)

Google Scholar

[4] Ming Zhou, Yanlin Guo, Xiaoan Wang. Research on supported frame for tower crane of Guangzhou Pearl River New Town West-tower[J]. Construction Technology, 2008, 37 (5): 22225. (in Chinese)

Google Scholar

[5] Wei Yang, Guorong Gu, Xiaoying Xiang, et al. Control system design for lifting formwork of Guangzhou Pearl River New Town West-tower[J]. Construction Technology, 2009, 38 (12). (in Chinese)

Google Scholar