Small Hydropower Dam-Break Severity Degree’s Evaluation Model

Article Preview

Abstract:

Power plant’s risk factors, the exposure of lower reaches and the capacity to deal with emergency are considered to establish small hydropower dam-break evaluation model. Calculating and analyzing the degree of severity of the Changlong Reservoir in Jiangxi Province,the quantitative indicators are obtained.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2106-2109

Citation:

Online since:

May 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Rural electrical and Electrification Development Bureau, the Ministry of Water Resources. China Hydropower sixty years [M]. Beijing: China Water Power Press, 2009, 11.

Google Scholar

[2] Zhejiang University. Rural hydropower stations [M]. Hangzhou: Zhejiang Science and Technology Press, 1985.

Google Scholar

[3] Li Lei, Wang Renzhong, Sheng Jinbao. Study on evaluation models of severity degree of dam-breakimpact [J]. Journal of Safety and Environment, 2006, 6(1):1-4.

Google Scholar

[4] He Xiaoyan, Liang Zhiyong. Review on the Research Dam-breakConsequece and Risk Standard [J]. China Flood Control and Drought Relief , 2008.12(6):51-55.

Google Scholar

[5] Zhao Li, Li Xin, Zhou Jin. An improved evaluation model for dam-breakbased on fuzzy AHP [J]. Journal of Safety and Environment, 2009, 9(2):176-181.

Google Scholar

[6] Huang Guanhong, Fang Gang. Systems engineering methods and application[M]. Guangzhou: Ji'nan University Press, 2005,5:78-106.

Google Scholar

[7] Wang Zhijun, Gu Chongshi, Liu Hongcai. Estimation of Loss一0f_life Caused by Dam Break Based on Fuzzy Matter—element and Exponential Smoothing Method [J]. Journal of Yangtze River Scientific Research Institute , 200926(1):25-28.

Google Scholar

[8] Sheng Changsong, Wang Shixia, Lin Yicai, et al. Hydraulic Structures [M]. Beijing: China Water Power Press, 2008: 11.

Google Scholar