Yeywa hydropower station RCC dam is located in the torrid zone of Asian, During the construction period, it meet Technical problem of temperature control in hot season. We can utilize the peculiarity of RCC that has a slow temperature rise due to hydration heat and a low early strength, according to analyse the blending and concreting procedure of RCC, adopt comprehensive and effective temperature control method, such as confirm concrete mix, control the temperature of raw material and RCC out of the batch plant, prevent temperature rise during transporting and concreting, setting joint to avoid structural crack and temperature crack. From Yeywa hydropower station RCC dam construction finished to now, no dangerous crack is detected, It accumulate experiences for RCC dam construction in high temperature place.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2110-2114

Citation:

Online since:

May 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Zhigang Wang, Dongcheng Zhang, Hongwei Luo, Construction Technique of RCC Dam, edtied by China Electricity Publications, Beijing, (2007)

Google Scholar

[2] Technique Requirement of RCC Dam Construction, edtied by China Electricity Publications, Beijing, (2009)

Google Scholar

[3] U.Win Kyi Dunstan M.R.H U.Khin Lat U.Zaw Min San Trial Mix Programmes and Full-scale Trials for Yeywa Hydropower Project, Myanmar,(2007)

Google Scholar

[4] Zhong Ning, Yi Li, Temperature Control Method of RCC Dam Construction of Long Tan Hydropower Station, edtied by China Hydropoer and Electricity Publications, Beijing, (2006)

Google Scholar

[5] Yingli Zhang, Enchiridion of Modern Concrete Mix Design, edtied by China People Transportation Publications, Beijing, (2002)

Google Scholar