p.3145
p.3153
p.3159
p.3166
p.3169
p.3175
p.3181
p.3186
p.3190
Study on Weak-Disturbance Construction Technology of Casing Bored Pile
Abstract:
Aiming at reducing the influence caused by the pile foundation construction on the existing structures nearby, this paper introduces a new technology of spinning casing bored pile, which is the optimization and combination of different construction technologies. Through the corresponding calculation and analysis, the influence scope and extent of this technology is obtained in this paper. This technology has been successfully applied in the pile foundation engineering of a passenger dedicated line close to subway shield tunnels, it can provide the similar project that needs to consider the influence on the surroundings with reference, and it is worth wide promotion and application.
Info:
Periodical:
Pages:
3169-3174
Citation:
Online since:
May 2012
Authors:
Price:
Сopyright:
© 2012 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: