p.3169
p.3175
p.3181
p.3186
p.3190
p.3194
p.3199
p.3203
p.3208
Current Situation and Development of Construction’s Control Method that Oversized Earth-Rock Mixtures Subgrade
Abstract:
Through large amount analysis of construction site investigation and data, we summed up several constructions control technologies and methods easier to achieve in projects for the aspect of the super-size filling embankment construction control technology.
Info:
Periodical:
Pages:
3190-3193
Citation:
Online since:
May 2012
Authors:
Keywords:
Price:
Сopyright:
© 2012 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: