Study on the Model of Integrated Risk Management for BOT Projects

Article Preview

Abstract:

Build-Operate-Transfer (BOT) contracts have been increasingly adopting for large infrastructure projects. However, BOT contracts have been a very important model for the investing and building the basic establishment. In order to improve management level and risk management ability for BOT projects, the model of integrated risk management for BOT projects is discussed in this paper. The risk involved in each phase of the project is analyzed. This paper suggests methods to mitigate these risks and put forward the correlative management flow and risk management process system as well as support technology. The method and technique put forward by this paper would be used for risk management of BOT projects. And it is effective for improve risk management ability and reduce the risk in BOT projects.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

3374-3377

Citation:

Online since:

May 2012

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Chuandong Zhang,Yilin Yin. An Analysis of the LC-Based Integrated Risk Management of Construction Project. 9th Pacific Association of Quantity Surveyors Congress. 2005,P.1-10.

Google Scholar

[2] You di. Study on the mode of integrated risk management in TOT projects. Project management Technology. Jan 2011,Vol.9 No.1 pp.50-54

Google Scholar

[3] David Hillson. Integrated Risk Management As A Framework For Organizational Success [C], 2006 PMIGlobal Congress Proceedings, SeattleWashington, 2006. pp.354-359.

Google Scholar

[4] Xiaohong Xie,Yong Li,Jinxiao Zhang. The Integrated Risk Management for BT Contract . Constraction and Architecture.2011(2):pp.52-53.

Google Scholar