Feasibility Study on Tilt Double Steel Arch Tower Segment Cantilever Assembling at the Site

Article Preview

Abstract:

Feasibility on tilt double steel arch tower segment cantilever assembling at the site is analyzed by finite element simulation, and the steel arch tower deformation and stress of each step during segment cantilever assembling process are gotten, the cantilever assembling program is improved by adjustment of the first time tension of the horizontal cables and temporary cables. These results are successfully used to control deformation and stress of steel arch tower during segment cantilever assembling, which provides the correct of simulation analysis and pioneers a new approach of similar projects design and construction.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

419-423

Citation:

Online since:

July 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] No. 8 Railway Engineering Department. In: Construction Plan of Steel Arch Tower of Guan Tang Bridge, (2010). (In Chinese).

Google Scholar

[2] Wang Xinmin. In: ANSYS numerical analysis of engineering structures, People's Communications Press, Beijing, (2000). ( In Chinese).

Google Scholar

[3] Wang Xin: Highway, 2009 (2), pp: 35- 38. ( In Chinese).

Google Scholar

[4] 2.Q. Chen T.J.A. Agar: Computer & Structure. Vol. 49 (6), 1993, pp: 25一36.

Google Scholar

[5] Code for Design of Steel Structures GB50017-2003, China plans Press, Beijing, (2003). (In Chinese).

Google Scholar

[6] Code for Basic Design of Railway Bridge (TB10002. 1-2005), People's Railway Press, Beijing, (2005). (In Chinese) (In Chinese).

Google Scholar