The Comparison and Selection of the Solutions for Liuyang River Tunnel’s Inclined Shaft Entering to the Main Hole and the Key Points of Construction
Abstract:
The construction geological condition is complex in the transition section from the inclined shaft to the main hole. There are two kinds of construction schemes. After the comparison of the advantages and disadvantages of the two different construction schemes, it has selected the construction scheme of the rectangular pilot tunnel vertical to the main hole. This paper solve the construction problem of the transition section from the inclined shaft to the main hole of large cross section tunnel of passenger dedicated line under complicated geological conditions. According to the previous research results, the method can be used to large-cross section tunnel. The scaffold design and auxiliary construction measures is detailed. Compared with the expected duration, it completed the transition construction ahead of time with the speed superior to the ones of other similar works, and forming a safe and efficient construction situation.
Info:
Periodical:
Pages:
149-153
Citation:
Online since:
September 2012
Authors:
Price:
Сopyright:
© 2012 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: