The Comparison and Selection of the Solutions for Liuyang River Tunnel’s Inclined Shaft Entering to the Main Hole and the Key Points of Construction

Article Preview

Abstract:

The construction geological condition is complex in the transition section from the inclined shaft to the main hole. There are two kinds of construction schemes. After the comparison of the advantages and disadvantages of the two different construction schemes, it has selected the construction scheme of the rectangular pilot tunnel vertical to the main hole. This paper solve the construction problem of the transition section from the inclined shaft to the main hole of large cross section tunnel of passenger dedicated line under complicated geological conditions. According to the previous research results, the method can be used to large-cross section tunnel. The scaffold design and auxiliary construction measures is detailed. Compared with the expected duration, it completed the transition construction ahead of time with the speed superior to the ones of other similar works, and forming a safe and efficient construction situation.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

149-153

Citation:

Online since:

September 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Du LiHong. The discuss on the construction methods for vertical shaft and inclined shaft, Shaanxi architecture, 11th issue in (2005).

Google Scholar

[2] PENG Le-ping. Implementation of Open-pit High-bench Deephole Blasting; Blasting; (2001).

Google Scholar

[3] Li Wengang, Sun Yirui, Yan Chenggui. The construction technology for the intersected segment between Five sharp mountain tunnel inclined shaft and the main hole. sci-tech communication, in (2007).

Google Scholar

[4] Zhang Jinbang. Application of Deep-hole(Medium-depth Hole)Block Chambering Method to the Thin Ore-body of Metal Deposit. (2007).

Google Scholar

[5] Zhu Li-xin NI Rong-fu. Stone Exploitation by Chamber Blastling Method; Blasting; (2001).

Google Scholar

[6] CHEN Yan-shan. Subgrade Stoneworks Blast Design and Implementation in Dawu Southern Section of Jingzhu Expressway[J]; Blasting; (2001).

Google Scholar

[7] Sun Fujun, Zhou Xiaoran. Research of constructing skil of 3th inclined shaft of the NanLiang tunnel of PDL of the Shijiazhuang-Taiyuan railway line pulling into the top hole . Development of Sci-Tech Information and Economies, in Feb. (2006).

Google Scholar

[8] Mai-Xing Ji. Construction Technology of Excavating Inclined Shaft with High-gradient and Over-length in Xilongchi Pumped-storage Power Station. water Power. (2006).

Google Scholar