Construction Control Technology of Drilling and Blasting Method in Multi-Arch Tunnel

Article Preview

Abstract:

This paper based on a highway reconstruction projects. It puts forward the construction control measures of over-excavation and undercut in process of construction with Drilling and Blasting Method of multi-arch Tunnel, and analyzed the effect of the blasting vibration to middle wall and supporting structure. It also points out that shock absorption should be adopted in the construction. At last, it discussed the problems needing attention in the construction process of the middle wall.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1293-1296

Citation:

Online since:

October 2012

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Zhong Fangping, Cause Analysis and Control Measures of Highway Tunnel Over-excavation and Undercut [J]. West-china Exploration Engineering, 2007, 12.

Google Scholar

[2] Zhang Hong, Fang Hua, Shang Aiguo, Technology Research on Highway Tunnel Destruction Soft Rock Blasting [J]. Rock and Soil Mechanics, 2007, 27(3):160-163.

Google Scholar

[3] Yang Zhonghua,the Tunneling Technology for Passenger-dedicated Lines in Stratified Rock Masses[J]. Traffic Engineering and Technology for National Defence, 2007, (1):85-88.

Google Scholar