Mechanism Study of Conflict Analysis and Countermeasure about BOT Project Organization

Article Preview

Abstract:

This paper analyzes BOT project for its basic operational procedures and organizational structure. Conflict of BOT project organization is divided into two levels. On this basis, respectively, to the general contractor and the project company as its core, described main task undertaken by the project stakeholders. It establishes a knowledge-based difference, the two-level model for organizational conflict of BOT projects.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1429-1432

Citation:

Online since:

October 2012

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] WANG-XiJun, WANG-MengJun, CHEN-HuiHua. BOT Project Operation and Management Practices [M]. CHINA BUILDING INDUSTRY PRESS, 2008: (145-151)

Google Scholar

[2] WANG-Yu, BOT Model of the Characteristic Advantages and Problems to Be Solved [J].CONSTRUCTION SUPERVISION, 2004(3):66-67

Google Scholar

[3] LAI-YiFei, ZHANG-Qing, YU-YuZhou. Project Procurement and Contract Management

Google Scholar

[4] LIU-YuFeng. International Engineering Project Group Cause and Countermeasures of Internal Contradictions and Conflicts

Google Scholar

[5] ZENG-ZhiQiang. Project Manager Department of Communication in Project Management and Coordination

Google Scholar

[6] WANG-ZhongTuo. Knowledge Management in Project Management

Google Scholar