Economic Analysis of Cascade Utilization of Mine Water and Recycled Water of Electric Power Plant

Article Preview

Abstract:

The scheme selection and system design of the regional central air conditioning system of Xiezhuang Coal Mine were presented. The cascade utilization of Mine water and recycled water of electric power plant was realized in this system. The system works well with decent economic benefits and accord with energy conservation and pollution reduction. At the same time, the economical efficiency and emission reductions of this system were analyzed, providing reference for regional central air conditioning system of the same type. The modulus of this system reaches comprehensive energy efficiency coefficient 4.83 in summer and 23.41 in winter. The increasing income and the saving investment are about RMB1.87b/a. CO2 emission reduction is 249.4t/a, SO2 11.3t/a, smoke and dust 8.5t/a, ash 147.4t/a.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1935-1940

Citation:

Online since:

October 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] National development and Reform Commission. Special planning for utilization of mine water. http://www.ndrc.gov.cn/ (In Chinese)

Google Scholar

[2] State Council of the People's Republic of China. Plat form for 12th five year plan for national economic and social development. http://www.gov.cn/2011lh/content_1825838.htm (In Chinese)

Google Scholar

[3] Zuolian Wu, Xiaochun Liu, Meng Wang, Hui Liu. Feasibility and economic analysis of used heat recovery from power plant with heat-pump technology [J]. Shandong Agricultural University Journal (Natural Science Edition), 2008,39(1):62-68 (In Chinese)

Google Scholar