Capacitated Supply Chain Operation Optimization of Assembly Manufacturing with Delivery Time Constraint

Article Preview

Abstract:

Operation optimization problem of capacitated assembly manufacturing supply chain was investigated in this paper. Three-stage system open equations of all planning periods were set up. Acceptable delivery time for customers form time window that was also considered as constraint on assembly system supply chain. The planning time is divided into many equally intervals, and operation decisions of every period can vary with time. Ability constraint in the process of supply chain operation, delivery time constraints and different production components’ quantity ratio constrain were all considered in the dynamic operation optimization model. Optimization problem is solved by hybrid mixed integral optimization and SQP algorithm. And a set of numerical examples that reveal the insights into the dynamic optimization policy.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

304-308

Citation:

Online since:

November 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Ziji Li, Shihua Ma, Peilin Guo et al.: Computer Integrated Manufacturing Systems, Vol. 15(2009), pp.1300-1306. (in Chinese)

Google Scholar

[2] C.-Y. Lee, S. Çetinkaya, A.P.M. Wagelmans, : Management Science 47 (2001) , pp.1384-1395.

Google Scholar

[3] H.-C. Hwang, W. Jaruphongsa: Operations Research Letters 34(2006) , pp.251-256

Google Scholar