Methods of Planning, Running and Optimization of Material Flow in the Laboratory of Flexible Manufacturing Systems with Robotized Manipulation Supported by No Drawing Production

Article Preview

Abstract:

This paper is focused on the methods, which are used for planning, running and optimization of material flow. These methods are very important element of each production and company. There are several methods which are used, for example JIT (Just in Time), Kanban, TOC (Theorie of Constraints), etc. A selection of appropriate method affects largely production costs, efficiency and produced quantity. For the laboratory of flexible manufacturing systems with robotized manipulation supported by no drawing production were compared several methods and on the based their advantages, disadvantages and suitability of use was selected the most appropriate method of planning, running and optimization of material flow.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

925-928

Citation:

Online since:

November 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] P. Kostal and A. Mudrikova, "Laboratory of Flexible Manufacturing System," in AMR, no. 429, p.31–36, ISSN 1022-6680, 2012.

Google Scholar

[2] K. Velisek, B. Katalinic: Výrobné systémy I.(Production Systems I.) - 1. vyd. - Bratislava: STU v Bratislave, 2004. - 208 s. - e-skriptá. - ISBN 80-227-2009-7

Google Scholar

[3] P. Kostal and K. Velisek, "The new drawing less manufacturing laboratory", in World Academy of Science, Engineering and Technology Issue, 65 May 2012 Tokyo, Japan, pISSN 2010-376X, eISSN 2010-3778

Google Scholar