Active Control of Fuzzy for High-Speed Pantograph

Article Preview

Abstract:

The regular current collection is very important for high-speed train, and can be obviously improved by the use of active control. In order to study the impact of the fuzzy active control on pantograph-catenary system, the model ohe simulation model is created with the software of simulink. Finally the influences of fuzzy active control on dynamic performances and quality of current collection of the pantograph-catenary system are analyzed. It seems that, the performances of the system with or without active control is established, the fuzzy controller is constructed, and tf the pantograph- catenary system can be improved obviously under the fuzzy active control, the maximum value of the contact force is reduced to 50 percent, the minimum is increased to 80 percent, and the fluctuation extent of the contact force is reduced to 70 percent.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

158-163

Citation:

Online since:

December 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Xing Haijun, Ma Shiqi, Yang Shaopu. The Research for the Dynamic Parameters of the Pantograph [J]. Journal of Vibration Measurement and Diagnosis, 2002, 22(3): 206~211.

Google Scholar

[2] Xing Haijun, Yang Shaopu, Shen Yongjun. Optimum Design on the Damping Mechanism of the Pantograph Frame[J]. Journal of Shijiazhuang Railway Institute, 2005, 15(1): 8~12.

Google Scholar

[3] T. X. Wu, et al. Active Vibration Control of a Railway Pantograph[J]. ISVR Technical Memorandum 820 June (1997).

Google Scholar

[4] Luo Ren, Zeng Jing. Active Control of Pantograph Vertical Vibration of Tilting Train[J] . Journal of Traffic and Transportation Engineering, 2006, 6(2): 11~16.

Google Scholar

[5] Wu Xuejie, Zhang Weihua, Mei Guiming, Lin Jianhui. Research on the Active Control of the Vibration of the Pantograph-catenary System[J]. Journal of Vibration Engineering, 2002, 15(1): 36~40.

Google Scholar

[6] Yang Gang, Li Fu. Semi-active Control for High-speed Pantograph Based on the LQR Optimal Regulator[J]. Journal of Railway, 2011, 33(11): 34~40.

Google Scholar

[7] Yu Wanju. Research on the Dynamic Current-carrying Characteristics of the Pantograph-catenary Contact System on High-speed Railway Lines[J]. Journal of Railway, 1993, 15(2): 16~26.

Google Scholar

[8] Zhang Weihua, Cao Xinwen. Dynamic Analysis of High Speed Pantograph-catenary System[J]. Journal of Southwest Jiao tong University, 1991, 79(1): 105~111.

Google Scholar

[9] Zhang Weihua, Huang Biao, Mei Guiming. Study on Pantograph-catenary System Based on Virtual Prototyping[J]. Journal of Railway, 2005, 27(4): 30~35.

Google Scholar

[10] Yang Gang, Li Fu. Research on Characteristics of the Rolling Collector Head of the Pantograph[J]. Electric Drive for Locomotives, 2010(4): 7~12.

Google Scholar