Key Technique on the Process Control for Construction of Hohhot Circle Expressway Asphalt Pavements

Article Preview

Abstract:

As vehicle flow on arterial highway in Inner Mongolia sharply increased, the originally designed natural increase rate of 8% per year has been exceeded on the vehicle flow in some sections. According to statistics, monthly average vehicle flow on major section of G6 expressway has reached a standard flow of 67478 vehicles per day and night, of which in 70-80% are large ones for coal transportation. Therefore, pavement load and road capacity have exceed the designed expressway load capacity. At present, semi-rigid base asphalt pavement structure is still widely used for high-grade highway pavement in Inner Mongolia. With years of construction for such pavement structure, a great deal of valuable experience has been gained on construction technology. However, there are still a few deficiencies in the quality of raw materials, gradation control of asphalt mixture and adjustment of equipment, etc. Hohhot circle expressway connects with the G6 and G7 expressways, suffering from problems such as large vehicle flow and load overweight. This paper introduced a key technique that should be properly controlled during construction of such pavement structure, emphasized technique control and management of the following aspects, i.e. ballast sizes and gradation control, asphalt concrete mixture, adjustment of pavers, validation of mixing proportion in production and reasonable arrangement of process, and summarized corresponding technical measures taken during construction of asphalt pavement in this project.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1748-1753

Citation:

Online since:

December 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Technical Specifications for Construction of Highway Asphalt Pavements, JTGF40-2004. China Communications Press, Beijing. (2004).

Google Scholar

[2] Standard Test Methods of Bitumen and Bituminous Mixtures for Highway Engineering, JTJ052-2000. China Communications Press, Beijing. (2000).

Google Scholar

[3] LIN Xiao-dong. Quality Control of Stone-Crushing Techniques in Asphalt Paving of Shaosan Expressway, Journal of Xiamen University of Technology, 15(4), P25-29, (2007).

Google Scholar

[4] Xie Haichao and Liao Rongning. The processing and analysis of gravel for Expressway, Journal of China & Foreign Highway, 23(5), P104-107, (2003).

Google Scholar

[5] PeiWen Hao. Asphalt pavement construction and maintenance technology. People's traffic press, Beijing. (2001).

Google Scholar

[6] Zhao Bin. The influence factors, s analysis of weighing precision for batch asphalt mixing plant, Highways & Transportation in Inner Mongolia, 78(1), P17-18, (2003).

Google Scholar

[7] Yu Jianhui. Design of weighing system for batch asphalt mixing plant, Road Machinery & Construction Mechanization, (4), P17-18, (2004).

Google Scholar