The Cyclic Scheduling of Material Transporting Robot in Group Shop

Article Preview

Abstract:

Group shop has the character of job shop and open shop, one robot is used to transport material, and the robotic cell produces multiple types of parts for a long time. In order to improve throughput, or minimize the cycle time, we establish the model of robotic cell, develop optimizing algorithm, and do computational experiments to find the better activity sequence for the robot.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

634-638

Citation:

Online since:

December 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] M.W. Dawande , H. N. Geismar, S.P. Sethi, C.Sriskandarajah. Journal of Scheduling 8, 387-426(2005)

Google Scholar

[2] H.Johann, K.Sigrid. Discrete Applied Mathematics 119, 181-203.( 2002.)

Google Scholar

[3] H.Johann, K.Sigrid. 2005. European Journal of Operational Research 162, 99-111. ( 2005.)

Google Scholar

[4] M.Sampels, C.Blum, M.Mastrolilli, and O.Rossi-Doria. Parallel Problem Solving from Nature - PPSN VII. 7th International Conference. Proceedings (Lecture Notes in Computer Science Vol.2439), 631-640.( 2002)

DOI: 10.1007/3-540-45712-7_61

Google Scholar

[5] S.P. Sethi, C. Sriskandarajah, G. Sorger, J. Blazewicz, W. Kubiak. International Journal of Flexible Manufacturing Systems, 4 : 331-358, (1992)

DOI: 10.1007/bf01324886

Google Scholar

[6] R. Logendran, C. Sriskandarajah. International Journal of production research,Vol.34, No.12, 3447-3463. (1996)

Google Scholar

[7] C. Sriskandarajah, I. Drobouchevitch, S.P. Sethi, R. Chandrasekaran, Operations research, Vol. 52, No. 1, p.65–82 (2004)

Google Scholar