Early Warning System of Power Grid’s Running Risk of Hebi Power Supply

Article Preview

Abstract:

According to the searching inquiry of the grid of Hebi and other power supply units, analysis for the running of the “Regulations” management and grid safety is still in the manual judgment and analysis phase, including the percentage of users of power transmission equipment. Considering its long artificial combing cycle and low efficiency, it cannot achieve the prevention and early warning of electrical safety incidents, basically in the subsequent statistical analysis part. Through the investigation of the above analysis, in order to improve the power grid’s run the risk of the forecast and early warning capacity, it is necessary to be assisted by an automated technical means to increase grid security and the level of operational management.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

60-64

Citation:

Online since:

January 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Li Jian, Problems exist in regional Power Grid, North China Electric Power, Vol. 12, (1977).

Google Scholar

[2] Yang Changyong and Liang Jie, Analysis and measures of accident of power grid in Central China, Electric Safety Technology, vol. 2, (2005).

Google Scholar

[3] Lu Yi, Reflection on anti-disaster and disaster prevention of the regional power supply enterprise, 2008 Anti-ice disaster and Electrical Protection BBS proceedings, (2008).

Google Scholar