Abstract:

Combining the actual situation of the electricity industry, this paper aims to help the staff establish a set of scientific and reasonable Indication System for Life Cycle Asset Management through improving and perfecting on the basis of the national power grid Life Cycle Asset Management Indication System. Through the established calculation mode of Life Cycle Asset Management and MEE Comprehensive Evaluation Mode, the system evaluates and researches on the selected substation, analyzing the evaluated result and finds the problems. And then discuss the new mode of Power Life Cycle Asset Management.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

39-44

Citation:

Online since:

January 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Jie Chen, Guangzhou grid transmission project evaluation and economic evaluation methods. Guangdong Power Grid Corporation.

Google Scholar

[2] Qijie Pan, The full life-cycle management of electrical equipment. North China Electric Power University.

Google Scholar

[3] Jun Zhang, Making based on full life-cycle cost (LCC) substation construction. Chongqing University.

Google Scholar

[4] Wei Jiang, Grid based on the asset life cycle engineering construction management. North China Electric Power University.

Google Scholar

[5] Jianguo LV, LCC theory of electricity project cost management. North China Electric.

Google Scholar