Feasibility Analysis on High Voltage Ride-through of Wind Turbines

Article Preview

Abstract:

With the rapid increase of wind farms, a set of specific requirements have been established or are developing. The objective of these grid guidelines is to ensure wind farms not adversely affecting the power system. The control strategies and theories on low voltage ride through (LVRT) have been focused on for a long time, how to deal with the gird high voltage is seldom discussed. This paper introduces the main types of wind turbines, discusses the major grid requirements of high voltage ride through (HVRT). The capability of HVRT for current wind farms is introduced. The technology and its implementation of the HVRT of wind turbines are focused on. The technical feasibility to increase the capacity of HVRT for wind turbines and the cost are analyzed in detail. Finally a conclusion is achieved, that is installing DC chopper can help converters to realize HVRT.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

134-138

Citation:

Online since:

January 2013

Keywords:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Transmission System Planning Criteria, Transpower New Zealand Ltd, July (2005).

Google Scholar

[2] Transmission 2040 (Grid Development Strategy) Work Package 2 – Grid Planning Guidelines Consultation Material November 2008, Transpower Grid Owner.

Google Scholar

[3] HVDC Upgrade Project document Define Transient Stability Fault Recovery Criteria, Transpower Grid Owner, 9 April (2008).

Google Scholar

[4] IEEE Standard C37-102-1995 IEEE Guide for AC Generator Protection by Power System Relay Committee of the IEEE Power Engineering Society, Approved December 12, (1995).

Google Scholar

[5] The Technical Basis for the New WECC VRT Standard, A White paper Developed by the Wind Generation Task Force (WGFT), June 13 (2007).

Google Scholar

[6] South Island Grid Upgrade Investment Proposal – Appendix B: Dynamic Modelling Assumptions, Transpower New Zealand Limited, September (2007).

Google Scholar

[7] DC Hybrid Link Project – Contract DC1 – Converter Stations, Transpower New Zealand Limited, Volume 2, Section 7. 1. 5. 2.

Google Scholar

[8] Australian National Electricity Rules, 6 March (2008).

Google Scholar

[9] Jovanovic M G, Betz R, Jian Yu. The Use of Double Fed Reluctance Machines for Large Pumps and Wind Turbines. IEEE Trans. on Industry Applications. 2002, 38(6): 1508~1516.

DOI: 10.1109/tia.2002.804749

Google Scholar

[10] Betz R, Jovanovic M G. The Brushless Doubly Fed Reluctance Machine and the Synchronous Reluctance Machine: A Comparison. IEEE Trans. on Industry Applications. 2000, 36(4): 1103~1110.

DOI: 10.1109/28.855966

Google Scholar