Optimal Planning of Distribution System Considering Distributed Generators

Article Preview

Abstract:

This paper presents a methodology for substation optimal planning considering DG for peak shaving. Utility can take effective demand-side management (DSM) to encourage customer-owned DG to participate in peak load shaving, and it can also construct utility DG to meet the peak load demand. In this paper, the impact of DG on peak load shaving is analyzed, and DG is taken as a complement to T&D system to meet load demand, which is considered in the substation planning. Substations sizing and location and new-built utility DG capacity is optimized using Particle Swarm Optimization (PSO), in which supply area of each substation is obtained by Voronoi diagram method. Case study shows that planning result considering DG for peak shaving can defer T&D system expansion so that considerable investment can be saved. Especially for those areas with high cost of T&D system construction, constructing DG to meet peak load demand would be a more economic way.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2022-2027

Citation:

Online since:

February 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Gil Hugo A., Joos Geza, 2007, Customer-owned back-up generators for energy management by distribution utilities, IEEE Transactions on Power Systems, vol. 22, 1044-1050.

DOI: 10.1109/tpwrs.2007.901485

Google Scholar

[2] Siano, P. Ochoa, L.F. Harrison, 2009, Assessing the strategic benefits of distributed generation ownership for DNOs, IET Generation Transmission & Distribution, vol. 3, 225 - 236.

DOI: 10.1049/iet-gtd:20080235

Google Scholar

[3] Brown R E, Pan J, Feng X, 2001, Siting distributed generation to defer T & D expansion, IEEE Transmission and Distribution Conference and Exposition, 622-627.

DOI: 10.1109/tdc.2001.971309

Google Scholar

[4] Ouyang Wu, Cheng Haozhong, 2008, Distribution network planning considering DG for peak shaving, Automation of Electric Power System, vol. 32, 12-15.

Google Scholar

[5] Chen Jun, 2002, Voronoi Dynamic Mathematical Space Mode, Surveying and Mapping Press, Beijing, China: 127-133.

Google Scholar

[6] Kobayashi K., Sugihara K., 2002, Crystal Voronoi diagram and its applications, Future Gerenation Computer Systems, vol. 18, 681-692.

DOI: 10.1016/s0167-739x(02)00033-x

Google Scholar

[7] Yang Lixi, Zhu Xiangqian, 2006, Substation optimal planning method based on Voronoi diagram, Proceedings of the CUS-EPSA, vol. 18, 10-20.

Google Scholar

[8] Lu Zhiying, Ge Shaoyun, Wang Chengshan, 2009, Substation Location Planning of the Weighted Voronoi Diagram Based on particle swarm optimization algorithm, Proceedings of the CSEE, vol. 29, 35-40.

Google Scholar

[9] Kennedy J., Eberhart R., 1995, Particle swarm optimization, Proceedings of International Conference on Neural Networks, IEEE, vol. 4, 1942-(1948).