Increasing the Capacity of Concrete Column with Integrated Permanent Formwork Using Wood-Wool Cement Board

Article Preview

Abstract:

Growing construction activities requires increase in construction materials. The conventional method of constructions results in a rise in construction waste. Formwork as a main factor to generate construction waste has been the topic of investigation. The permanent formwork has been introduced with the aim to: promote the construction technology process that put quality, safety and environment issues into account, reduce the cost of workers and reduce the overall time of construction project. At present the permanent formwork available in the market are made from steel, and plastic and the cost is still high. Therefore this study is looking at the potential of commercial wood-wool cement board (WWCB) as permanent formwork. A series of concrete columns were constructed with and without integrated WWCB with different configurations of WWCB as permanent formwork. These columns were subjected to axial load and the compressive strength and failure modes were recorded. The results show that the present of permanent formwork from WWCB improves the compressive strength of the column. With the permanent formwork, the size of concrete column can be reduced and able to support the same load as column without permanent formwork. Therefore this construction method can reduce the overall cost of construction.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1305-1309

Citation:

Online since:

June 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] M. Arslan, S. Osman, and S. Subasi, "Effects of formwork surface materials on concrete lateral pressure," Construction and Building Materials, vol. 19, p.319–325, (2005)

DOI: 10.1016/j.conbuildmat.2004.07.007

Google Scholar

[2] H.L. Robert, "Think formwork-reduced cost," Structure Magazine, April 2007.

Google Scholar

[3] A.R.B.Z. Abidin, "Simulation of industrialised building system formation for housing construction", Master thesis, University Technology Malaysia, Unpublished, (2007)

Google Scholar

[4] Eltomation, (2012, January 12). Networks. [on line]. Available: http://www.eltomation.com/Eng/wwcb-eb-plant.html

Google Scholar

[5] R.W. Wolf and A. Gjinolli, "Cement-bonded wood composites as an engineering material".In Proceedings Use of Recycle Wood and Paper in Building Applications, Proc. No. 7286, Forest Prod. Society, Madison, Wisconsin USA, 1996. pp.84-91.

Google Scholar

[6] D.A. Eusebio, F.P. Soriano, R.J. Cabangon and P.D. Evans. "Manufacture of Low-cost Wood–Cement Composites in the Philippines using Plantation-grown Australian Species. II. Acacias," In Proceedings of Wood-cement Composites in the Asia-Pacific Region, 10 Dec. 2000, Canberra, Australia; pp.105-114.

Google Scholar

[7] S.R. Karade, "Cement-bonded composite from lignocellulosic wastes," Construction and building materials, vol. 24, no. 8, pp.1323-1330, 2010.

DOI: 10.1016/j.conbuildmat.2010.02.003

Google Scholar

[8] Duralite Sdn. Bhd. (2012, January 12). Networks. [Online]. Available: http://www.duralite.com.my/profile.htm.

Google Scholar