Abstract:

The joint optimization problem of product schedule and preventive maintenace in the flow shop is NP hard. In this paper, a joint optimization model was firstly established by abstracting the tobacco production process into a equivalent two-machine flow shop. And then a simplified method was proposed to solve the model according to the characteristic of the problem. Finally, a case was used to verify the validity of the model and the effectiveness of the method.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

17-21

Citation:

Online since:

June 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Zhigao-jiang.Study on single machine problem with maintenance and variable processing time.Industrial engineering and management (2011), pp.68-74.

Google Scholar

[2] C.-Y. Lee, V.J. Leon, Machine schedule with a rate-modifying activity, European Journal of Operational Research 128 (2001),p.119–128.

DOI: 10.1016/s0377-2217(99)00066-1

Google Scholar

[3] C.-Y. Lee, Z.-L. Chen, Schedule jobs and maintenance activities on parallel machine, Naval Research Logistics 47 (2000),p.145–165.

DOI: 10.1002/(sici)1520-6750(200003)47:2<145::aid-nav5>3.0.co;2-3

Google Scholar

[4] M.A. Kubzin, V.A. Strusevich, Planning machine maintenance in two-machine shop scheduling, Operations Research 54 (2006)p.789–800.

DOI: 10.1287/opre.1060.0301

Google Scholar

[5] M.A. Kubzin, V.A. Strusevich. Two-machine flow shop no-waiting scheduling with machine maintenance, Operations Research 3 (2005) 303–313.

DOI: 10.1007/s10288-005-0070-1

Google Scholar

[6] H.Allaoui, S.Lamouri. Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to the makespan, international journal of production economics 112(2008), pp.161-167.

DOI: 10.1016/j.ijpe.2006.08.017

Google Scholar

[7] Cassady, Kutanglue. Minimizing job tardiness using integrated preventive maintenance planning and production scheduling. IIE Transactions (2003), pp.503-513.

DOI: 10.1080/07408170304416

Google Scholar

[8] Binhai-Zhou,Shuyu-jiang. Integrated production and preventive maintenance scheduling algorithm for flow shops.Journal of Dalian Maritime University(2007), pp.33-35.

Google Scholar