Communication Study in Track Circuit System in One Line in Shanghai Metro

Article Preview

Abstract:

This paper introduces the signal data acquisition method of the FSK signal using NI equipment in the track circuit system, and the FSK signal modulation demodulation based on LabVIEW . The track circuit communication detection device for Shanghai metro line 2 provided effective means, saved maintenance costs, created the economic benefit and laid the foundation for subsequent signal detection. solved the problem that without special equipment detection in wayside, it can also realize the results of detection intuitively and the quantitative analysis of technical index

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1748-1753

Citation:

Online since:

July 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Zhang huanzen Chai xiaodong, Ma ziyan. Based on LabVIEW rail transit vehicles communicate FSK signal detection device [J]. Shanghai University of Engineering Science . 2010, 24 (2): 101-104.

Google Scholar

[2] Yu Hui. Shanghai Metro Line 2 communication system analysis [J]. Railway Signalling & Communication, 2004, (10): 32.

Google Scholar

[3] Zhang huanzen Chai xiaodong, Ma ziyan. Based on LabVIEW frequency shift keying signal detection device [J]. Urban Mass Transit . 2011, 4 (4) : 55-58.

Google Scholar

[4] Xu xiaodong Zheng duiyuan, Xiao wu compiled. LabVIEW 8. 5 to frequently used functions and programming examples succinctly [M] Beijing: Electronic Industry Press, (2009).

Google Scholar