Based on a ultra-deep diaphragm wall of Pangduo hydropower station, time of pipe drawn and drawn force under different times and hole deviation was researched. Field test was used to verify analysis conclusion. The results show that drawn time is 7~8 hours after concrete pouring, that is 40m high concrete after pouring. Several factors has effect on drawn force which relates to contact characters between sliding pipe and concrete and hole deviation.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

915-918

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Guan Z.C. Guan: Water Resources and Hydropower Engineering Vol. 40(2009), pp.31-34. in Chinese.

Google Scholar

[2] H.W. Zhang, X.G. Yang, and H.T. Li: Yangtze River Vol. 40(2009), pp.27-31. in Chinese.

Google Scholar

[3] Y.C. Song, J.X. Jiao, and Y.L. Zhang: Water Resources and Hydropower Engineering Vol. 40(2009) , pp.41-44. in Chinese.

Google Scholar

[4] C.H. Zhao, W. C and B. M: Water Resources and Hydropower Engineering Vol. 42(2011), pp.87-90. in Chinese.

Google Scholar