Analysis of Displacement Caused by Excavation at the Existing Bridge Abutment Cone
Abstract:
Excavation of existing bridge abutment cone is different from excavation of foundation pit, and the bridge abutment is also different from the slope. During the course of construction at the cone, the settlement and horizontal displacement come into being, but the disciplines of them are very different from the foundation pit and slope. With the engineering example, the discipline of deformation along the length of excavation area is got by monitoring on the abutment surface. The conclusion can provide basis for the reinforcement design of the excavation area at the bridge abutment cone.