The Analysis of Butterfly Effect on Project Quality in the View of Quality Chain

Article Preview

Abstract:

By proposing the concept of project quality chain and on the theory of butterfly effect in chorology, this paper studies the forming reason of the butterfly effect in the project quality chain. It also puts forward such measures to manage the defects in the quality chain as the early intervention of quality supervision and quality risk source identification and timely control. This research contributes theoretically to realize the quality supervision of construction whole life cycle. With the rapid development of economy and urbanization in China, the construction project presents the features of huge investment, technical sophistication, new material application and quick update, which brings the difficulties and challenges to the supervision on project quality, therefore, the single phase supervision cannot meet the requirement. For recent years, the quality defect in construction engineering has become the social issue and the dispute on the quality of commodity houses in urban area, proving to be one of the ten complaints in national consumption since 2001 and resulting in various hassles and social resources wasting [.The potential quality defects are associated with construction engineering at any stage of the whole life cycle where an invisible but a continuous chain exists, that is, the quality chain. This concept is the modern theory viewing from quality management to ensure the products to meet customers demands through integrating the overwhelming resources of participants in the chain [.Since the influence on quality from many implementing bodies, the research on the project quality chain and its butterfly effects provides the theoretical reference to realize the quality supervision in the whole life cycle of construction project.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1584-1588

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Zhao Hai-peng, Chen Xiao-long, Lin Zhi-yan. Economic Analysis of Inherent Defects Insurance System [J]. Journal of Tongji University(Natural science), (2007)In Chinese.

Google Scholar

[2] Zheng Jiang-tao. EPC Study on EPC Project Quality Chain Management [A Thesis Submitted to Chongqing University in PaIrtial Ful6llment of the Requirement for the Degree of Master of Management]. (2011)In Chinese.

Google Scholar

[3] Troczynski, Tom. The quality chain, Quality Progress, Sep96, Vol. 29Issue9, 208.

Google Scholar

[4] Tang Xiao-fen, Den Ji, Jin Sheng-long. Study on the theory and the operation mode of quality chain [J]. Proceedings of the 2nd China Quality Academic BBS, (2005)In Chinese.

Google Scholar

[5] Liu Tie-ju. The butterfly effect and its application [M]. Modern physics knowledge, (2006)In Chinese.

Google Scholar

[6] Liu Jing, Mao Long-quan, Chen Hu. An Analysis of the Construction. Market Credit Using"Butterflv Effect"Theory [J]. Construction Management Modernization, (2008)In Chinese.

Google Scholar

[7] Shen Jian-ming. Project risk management [M]. Mechanical industry press, (2005)In Chinese.

Google Scholar

[8] Han Guo-bo, Gao Quan-chen, Ma Jing-hua. Study on Quality Risk Management of Construction Project Quality Control[C]. Proceedings of 2006 International Conference on Construction & Real Estate Management. (2006)In Chinese.

Google Scholar

[9] Zhang Chi, Shi Jing-hang. Quality control of construction drawings reviewing [J]. Construction Management Modernization, (2009)In Chinese.

Google Scholar