Application of Gray-Fuzzy Comprehensive Evaluation in Duration Risk Forecast of Hydropower Project
Abstract:
Period risk study and gray-fuzzy comprehensive evaluation is introduced and extended into hydropower project in this paper. The characteristics of hydropower project and the importance of duration risk are analyzed, and duration risk study and gray-fuzzy comprehensive evaluation is used to hydropower project based on an index system. A gray-fuzzy comprehensive evaluation predictive model is built and applied to a hydropower project. The result show that the model and method proposed is valid.