The Construction Agency's Reasonable Profit Research Based on System Dynamics

Article Preview

Abstract:

The government investment in the construction project general always use of the design budgetary estimate as the construction-agent charge fees foundation, and with reference to the owners management cost rate to calculate the construction-agent charge. By analyzing the composition of the construction-agent charge and the difference between the owners management cost and the construction-agent charge, studying of the composition and rates of construction-agent charge in various key cities nationwide in detail, pointing out the fact that the current generation of construction-agent charge rates are too low, and then established a system dynamics model and analyzed the relationship between a reasonable profit margins and project success rate dynamically. Pointed out the necessity of a reasonable profit margin, and make same recommendations accordingly.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2478-2482

Citation:

Online since:

August 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Ministry of Finance. Finance Build.

Google Scholar

[2002] No. 394 on the issuance of "Basic Construction Financial Management Regulations [S], September 27, (2002).

Google Scholar

[2] LiuHaiYing. Construction project construction-agent charge billing standard [J] Jiangxi province discusses engineering consultation center. June 2, (2010).

Google Scholar

[3] Wang Man Liang. Construction project determine the agent cost [J]. Shanxi building, in April, 2010, 36 (12): 201-202.

Google Scholar

[4] Fang Jun, Xu Jianwu. The research on the government investment projects' construction management model [M]. Wuhan University Press, (2007).

Google Scholar