Construction Safety Control and Management on Extra-Large Underwater Caisson in Taizhou Bridge

Article Preview

Abstract:

The new-type structure of "three towers of two-span" suspension bridge with the main span of 2×1080m is put to use in Taizhou Bridge. The foundation of Middle Tower adopts an extra-large underwater caisson structure with the three dimension size about 58m×44m×76m, which has been so far the deepest underwater caisson in the world. The caisson is divided into two sections, that is, Steel Caisson on the bottom and Concrete Caisson on the top. The underwater positioning, landing of Steel Caisson and the height addition construction of Concrete Caisson are of great construction difficulties and thus brought high safety risk. In this paper, Taking Taizhou Bridge as background, the safety control technology and management of underwater caisson construction is presented, which can play a good reference for similar projects.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1124-1128

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Lin Ji, Dazhang Han: Design of Taizhou Yangtze River Bridge(In Chinese). Modem Transportation Technology vol. 5(3) (2008), p.20.

Google Scholar

[2] Jianchi Zhong: Innovation on construction technologies of Taizhou Yangtze River Bridge (In Chinese). Modem Transportation Technology vol. 7(1)(2007), p.35.

Google Scholar

[3] Baohong Xu: Construction Technology of sunk well and preventive measures of common questions encountered (In Chinese). Shanxi Architecture vol. 33(22)(2007), p.163.

Google Scholar

[4] Longhua Huang, Wei Zhou, Tao Liu: Research of construction scheme for caisson foundation of intermediate tower of Taizhou Bridge (In Chinese). Bridge Construction, vol. (2)(2008), p.63.

Google Scholar

[5] Jianliang Ye: Research on floating, positioning, and landing of Steel Caisson in Tazihou Bridge (In Chinese). Highway vol. (12)(2008), p.100.

Google Scholar

[6] Ning Yang, Wenfu Xiao, Lin Ji: Research of Positioning Scheme for Caisson of Intermediate Tower of Taizhou Changjiang River Highway Bridge (In Chinese). Bridge Construction vol. (4)(2009), p.64.

Google Scholar

[7] Wenfu Xiao, Qiongge Fu, Jianbo Liu, Shihong Zhai, Peng Liu: Subsidence monitoring technology of extra large Caisson in Taizhou Bridge (In Chinese). Modern Transportation Technology vol. 6(2)(2009), p.8.

Google Scholar

[8] Qionghai Qiu, Guoxiong Lin: Manufacture, assembly of Steel Caisson and height addition construction of Concrete Caisson in Taizhou Bridge(In Chinese). Railway Standard Design vol. (9)(2009), p.50.

Google Scholar

[9] Guoxing Xia, Hongchi Du: Water dredging construction method of the super scale caisson (In Chinese). China Engineering Science vol. 12(4)(2010), p.24.

Google Scholar