Analysis of Large-Span Steel Concrete Railway Arch Bridge Suspender Tension

Article Preview

Abstract:

In this paper the concrete-filled steel tube concrete arch bridge as the research object, through the finite element program MIDAS, analyzes the internal force of the whole bridge, determined the distribution of internal force and the most unfavorable position; Using the force balance method, taking the reasonable stress of the bending moment status to control goals, determines the boom of the bridge as the condition of reasonable internal force; Use fall down method, according to the reverse sequence in order to cut the boom, each cut as a model for internal force calculation and analysis, get the next will be cut derrick's internal force, its value is the order construction boom of the initial tension.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1259-1263

Citation:

Online since:

August 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Shaohuai Cai. Modern concrete filled steel tube structure [M]. Beijing: people's traffic press, (2003).

Google Scholar

[2] Baochun Chen. Concrete filled steel tubular arch bridge design and construction [M]. Beijing: people's traffic press, (1999).

Google Scholar

[3] Jianlong Ye, Jianyuan Sun. Girder and arch combination bridge flexible boom tension and analysis to determine[J].Northeast highway, 2003, (1) : l4 ~ l6.

Google Scholar

[4] Xuanmao Peng. Bowstring arch bridge boom of the initial tension calculation method[J].Water conservancy and hydropower science and technology progress, 2000, 20 (6) : 32-33. Alpha.

Google Scholar