Parameter Analysis on High-Pier's Effective Length Factor of Fabricated Beam Bridge

Article Preview

Abstract:

This paper illustrates the calculation method of effective length factor of the high-pier of fabricated beam bridge on the basis of Eulers formula by obtaining the critical force of first-order buckling according to the stability analysis. Engineering example is applied to calculate the effective length factor in the construction stage of fabricated beam bridge. Further, parameter analysis is used to study the variation of effective length factor and the influence of dead weight, non-ideal boundary conditions, the height and the radius of high-pier on it is evaluated. Results show that: there are many influencing factors acting on the effective length factor which cannot simply be represented by a fixed value and the calculation of the effective length factor should depend on the specific conditions of high-piers.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1272-1277

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Zeng Zhaoliang. Discussion on Effective Length of High-pier[J]. Journal of China & Foreign Highway, 2008, 5: 37-40.

Google Scholar

[2] Zhang Zhe, Li Wenwu, Ye Yi. Research on Effective Length of Pile Foundation of bridge structure with high-pier [J]. Highway, 2011, 6:13-17.

Google Scholar

[3] Zhao Minghua. The Effective Length of Pile Foundation in the Bridge Structure[J]. Engineering Mechanics, 1987, 14 (1): 26-30.

Google Scholar

[4] Zhao Minghua. Buckling Analysis on Pile Foundation of Bridge Structure and its Test [J]. China Journal of Highway and Transport, 1990, 3(4): 47-57.

Google Scholar

[5] Zhu Datong,Fu Chaofang. The Effective Length of Pile [J]. China Journal of Highway and Transport, 2001, 14: 25-29.

Google Scholar

[6] Chen Shaofan., Guide for Stability Design of Steel Structure(2nd edition)[M]. Beijing: China Architecture & Building Press, 2004. 1-17.

Google Scholar

[7] Code for D esign of Ground Base and Foundation of Bridges and Culverts (JTG D63-2007) [S].

Google Scholar

[8] Gao Xiao-ni. He Shuan-hai, Qi Hong-xue. Effective Length Factor of High-pier Analysis Considering Pile Foundation Flexibility of Multi-span Girder Bridge[J]. Journal of Wuhan University of Technology, 2011. 07: 33(7).

Google Scholar