p.1335
p.1339
p.1344
p.1348
p.1353
p.1358
p.1362
p.1366
p.1370
Assessment of Risks during Large-Span Steel Truss Arch Bridge Construction
Abstract:
Chongqing Chaotianmen Bridge is by far the world's largest three-span continuous half-through double-layer steel truss tied arch bridge. Risk evaluation and risk analysis are made to the bridge during construction period. At the same time, various measures are taken to avoid construction risks and accidents. The principal line of risk controls is clear with reasonable control measures. Chongqing Chaotianmen Bridge was completed and available for traffic on April 29, 2009, its various technical and quality indicators are in accordance with design and specifications.
Info:
Periodical:
Pages:
1353-1357
Citation:
Online since:
August 2013
Authors:
Keywords:
Price:
Сopyright:
© 2013 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: