Design of Extension Project of Huangpu Road Wastewater Treatment Plant in Wuhan City

Article Preview

Abstract:

Efficient sedimentation tank and Biological Aerated Filter are introduced in extension project in Wuhan Huangpu road WWTP,the first-stage project pretreatment capacity of which is 10×104m3/d.This process provides high treatment efficiency while occupying a small footprintnoise reduction and has little environmental impact.The effluent quality meets the first level A criteria specified in Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB18918-2002).This project demonstrates the successful handling of the environmental issues arising from the construction of wastewater treatment plantin highly urbanized area

You might also be interested in these eBooks

Info:

Periodical:

Pages:

555-561

Citation:

Online since:

August 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Ren Liang, Zhang Dan. Design of Demolition and Upgrading and Reconstruction Project of Changzhou Qishuyan Wastewater Treatment Plant [J]. Water Supply and Drainage, 2010, 36(2): 27-31.

Google Scholar

[2] Zhang Huawei, Chen Wenhua, Liu Xianbin. Process Design of Phase-III Expansion Project of Chongqing Tangjiatuo Sewage Treatment Plant. Water Supply and Drainage, 2011, 37(3): 38-41.

Google Scholar

[3] Huang Xuda, Wang Lin. Design of Expansion Project of Qingdao Maidao Sewage Treatment Plant. Water Supply and Drainage, 2009, 33(9): 31-35.

Google Scholar

[4] Xing Zhu. Characteristics and Application of SBR Process. Tianjing Chemical Industry. 2008, 22(2): 52-53.

Google Scholar

[5] Zhang Chen, Zhang Xin, Du Dong. Design of Reconstruction Project of Shanghai Bailonggang Sewage Treatment Plant. Water Supply and Drainage, 2008, 34(4): 16-19.

Google Scholar