Study on the Price Design of AGC Service in China

Article Preview

Abstract:

according to the characteristics of the AGC in China, and present a method to calculate AGC cost, this method divide AGC cost into power generation cost, equipment investment cost, opportunity cost and adjusting cost. Make independent power producer automatic generation control cost get reasonable recycling, enhance the enthusiasm of the plant to provide ancillary services, avoid causing aspects of the contradiction between supply and demand, and providing assistance to reduce the impact on the quality of power supply. The last is verified by an example.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2293-2297

Citation:

Online since:

September 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Ju GE, Lizi ZHANG, Xiaobing ZHOU, Lei DONG. DISCUSSION ON AGC UNITS PARTICIPATING ANCILLARY SERVICES IN ELECTRICITY MARKET[J] POWER SYSTEM TECHNOLOGY. 2002, 26(12): 61-65.

Google Scholar

[2] Ying ZHAO. Overview of power market ancillary services and cost research [J] CHINA ELECTRIC POWER EDUCATION. 2007, z1: 257-259.

Google Scholar

[3] Chunhua TAO, Wenguang MA. AGC cost in power market[J] EAST CHINA ELECTRIC POWER. 2006, 34(4): 5-6.

Google Scholar

[4] Feng ZHOU, Buying WEN, Haozhong CHENG. Research on Cost of AGC in Power Market[J] NORTH CHINA ELECTRIC POWER. 2002, 10: 31-33.

Google Scholar

[5] Xueling LI, Jiena ZHOU. AGC cost in the generation market[J] POWER SYSTEM PROTECTION AND CONTROL. 2008, 26(12): 61-65.

Google Scholar

[6] Juanjuan WANG, Weidong LI, Wenlei ZHAO, Yunli ZHAO. Overview of AGC ancillary service costs in electric market[J] POWER SYSTEM PROTECTION AND CONTROL. 2010, 38(24): 56-60, 76.

Google Scholar

[7] Chenxiong GONG, Jiangang YAO, Xiangui YANG. Evaluation Method of Auxiliary Service Examination and Compensation of AGC Units[J] Proceedings of the Chinese Society of Universities. 2011, 23(5): 137-141.

Google Scholar

[8] Jayant Kumar, Kah-Hoe Ng, Gerald Sheblt. AGC SIMULATOR FOR PRICE-BASED OPERATION PART 1: A MODEL,IEEE Transactions on Power Systems,1997, 527-531.

DOI: 10.1109/59.589593

Google Scholar

[9] R. Raineri,S. Rıos,D. Schiele. Technical and economic aspects of ancillary services markets in the electric power industry: an international comparison. [J]ENERGY POLICY,2005, 1541-1554.

DOI: 10.1016/j.enpol.2004.11.015

Google Scholar