The Special Geological Conditions of Mountain Tunnel Scheme Selection

Article Preview

Abstract:

According to the different topographic and geologic conditions of mountain highwaytunnel project has been "It is difficult into the hole and out the hole " argument. The paper is WuGuanhigh-speed road asymmetric bias multi-arch tunnel, and the orthogonal hole separated tunnel, near themountain steep high slope of shallow buried tunnel into the hole as an example. Through theconstruction of practical engineering, analysis in special conditions is done and the mechanicalmechanism of hole program is correctly chosen. Importance and the experiences are summarized, toguide the engineering practice.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1288-1291

Citation:

Online since:

September 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Jianping Chen. 《Design and construction of tunnel oblique hole pile of high cut slope rock 》China academic papers in traffic civil engineering set . Southwest Jiao Tong University press.

Google Scholar

[2] Code for design of highway tunnel (JTG D70-2004).

Google Scholar

[3] Lingyun Li. The disease cause of tunnel lining crack analysis and treatment of strengthening technology [J]. Hunan traffic science and technology , 2006, (03).

Google Scholar

[4] Shanyun Guo . Tunnel construction technology scheme and method of selection of [M]. tunnel construction, (2006).

Google Scholar

[5] Yicai Wang . Tunnel engineering [M]. China Communications Press, (1987).

Google Scholar

[6] Liping Yi. Modern design and construction of tunnel [M]. Beijing: China Railway Press, (1997).

Google Scholar