Study on Construction Risk Assessment Method of Deep Buried Tunnels

Article Preview

Abstract:

High speed railway tunnel have many uncertainty hazard factors in construction, at the stage of construction drawing design and during tunnel construction process. Taking no.1 tunnel in Xuefeng Mountain as a deep buried tunnel in the paper, tunnel construction risk source and main risk identification are analysis, main risk assessment during construction is recognized and reference for other similar projects is provided.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1305-1308

Citation:

Online since:

September 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Zan Wu. A discussion on railway tunnel risk assessment method[J]. The railway engineering cost management, 2007, 22(6): 8—11.(in Chinese).

Google Scholar

[2] The ministry of railways of the People's Republic of China. Provisional rules of railway tunnel of risk assessment and management[s]. 2007(in Chinese).

Google Scholar

[3] Meili Lu, Weining Liu, Furong Luo, etc. Research progress on tunnel and underground engineering risk assessment method [J]. Journal of engineering geology. 2007, 4(4):464—468. (in Chinese).

Google Scholar

[4] Yunfei Chen, Yunsheng Zhao. A discussion on tunnel construction risk management system[J]. Industrial safety and environmental protection, 2009. (in Chinese).

Google Scholar

[5] Yikun Chen, Changqing Zheng, Lei Cao. Research and discussion on Railway tunnel risk evaluation system [J]. Railway standard design. 2007. (SI):12—16.(in Chinese).

Google Scholar