The Research on Selection of Estimate Methods of Artificial Man-Days Unit Price of Power Construction Project

Article Preview

Abstract:

The selection of caculation method of the artificial man-days unit price of power construction projects is the focus and hotspot problem of the parties of power construction project and cost management departments. With domestic typical provinces, cities, and industry as the research object, this paper carried out case study and comprehensive analysis of three typical estimate methods of the basic principle, characteristics, application scope etc. The paper gives reference for the selection of estimate method of artificial man-days unit price of power construction project and this research conclusion to estimate method has strong pertinence and guidance.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

3437-3441

Citation:

Online since:

September 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Lifang Jia: Shanxi building, 2012, pp.256-257. In Chinese.

Google Scholar

[2] Wei Li, aiqiang Nan: Science and Technology of Highway Traffic, 2012(6), pp.455-459. In Chinese.

Google Scholar

[3] Jing Yu: Economic Management, 2004(20), pp.1-6. In Chinese.

Google Scholar

[4] MILES M B: Academy of Management Review, 1979(24), pp.590-601.

Google Scholar