The Engineering Insurance Mode Selection under the EPC Contract Conditions

Article Preview

Abstract:

The general contractors and owners face more risk in the EPC contract. But the people are usually used in international projects, and it has been applied in Chinese, the use of engineering insurance risk transfer, so choose the right insurance coverage critical to the promotion of the EPC contract. This paper by engineering insurance insuring the two modes: We analysis with the owners insured mode and contractors insured mode, that the contractor insured model is more suitable for the EPC contract, control more effective risk, and eventually reach the owners and contractors a common profits.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

3442-3446

Citation:

Online since:

September 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Sujun Mei. Engineering Insurance System. Chongqing: Chongqing University, 2006, In Chinese.

Google Scholar

[2] Yanling Chen. The Characteristics of the insurance model of the Three Gorges Project. Northern Economy and Trade. 2010, 11: pp.94-95, In Chinese.

Google Scholar

[3] Xing Gao. Construction project insurance contract and the related problems. Nanjing: Southeast University, 2005, In Chinese.

Google Scholar