A Study of Environmental Risk Comparison Based on Set Pair Analysis Theory

Article Preview

Abstract:

The unreasonable plan and layout on Petrochemical Park will increase environmental risk. Based on conception for identity degree in Set Pair Theory, environmental risk on Petrochemical Park of multiple planning schemes was compared. The paper formed the Set Pair Analysis model on scheme comparison and introduced a case of Petrochemical Park. The identity degree of three alternative schemes for the case was calculated. The identity degree of A scheme is 0.949, B scheme is 0.984 and C scheme is 0.945.The identity degree of B scheme is maximum which can be the optimum selection for the Petrochemical Park in case.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2161-2165

Citation:

Online since:

September 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] XIA Chen zhi, GUANG Xiao ping, WANG Fei. A study on comparison of the urban rail transitline network planning based on set pair analysis. Journal of Lanzhou Jiaotong University, 2010(29)4: 22-27. (in Chinese).

Google Scholar

[2] HU Han dong. Studies on the evaluation methods of the project management on the basis of RSDM, Journal of Hefei University (Natural Sciences), 2011(21)2: 15-17. (in Chinese).

Google Scholar

[3] XU Jian xin, ZHAO Peng, LU Jian hong. Set pair analysis method applied to evaluate water saving society planning journal of north China institute of water. Conservancy and Hydroelectric Power, 2010(31)3: 1-4. (in Chinese).

Google Scholar

[4] DING Jinming, LI Jianbo, ZHONG Hong. Influence of foundation embedment on seismic response of power house for nuclear power station. Water Resources and Power, 2010 28(10): 33-37. (in Chinese).

Google Scholar

[5] Zhao Keqin. Set Pair Analysis and its preliminary application [M]. Hangzhou: Zhe jiang Science and Technology Press, 2000. (in Chinese).

Google Scholar