Simulation and Optimization Design on the Amplitude Changing Mechanism of Boom System of Five-Arm Concrete Pump Vehicle

Article Preview

Abstract:

The 3D entity model for the amplitude changing mechanism of boom system of certain 48 meters concrete pump vehicle was established by means of Pro/E software, and then it was imported into ADAMS/VIEW to find out the maximum load carrying capacity of hydraulic cylinder under various working conditions. Under the environment of ADAMS/VIEW, parametric model of boom system was built. Utilizing the measure of design evaluation tools (DET) in ADAMS, optimization design of the amplitude changing mechanism of boom system was commendably achieved. This method evidently minimized the maximum load carrying capacity of hydraulic cylinder, and greatly improved the working performance of boom system.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

178-182

Citation:

Online since:

December 2010

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Z. J, Gou, X.P. Pan: Machine Design Vol. 26 (2006), p.40~42.

Google Scholar

[2] The National Development and Reform Commission: Concrete Pump Vehicles (China Planning Press, China 2005).

Google Scholar

[3] M.L. Cha, B.M. Wang: Coal Machine Vol. 28 (2007), p.85~87.

Google Scholar

[4] X. W, F.H. Cai and S.D. Gao: Construction Machine Vol. 15(2007), p.62~64.

Google Scholar