Application of Neural Network in Duration Implicit Cost Control for Construction Projects

Article Preview

Abstract:

According to the characteristics of construction project, it set the third level of duration implicit cost, deepening the understanding of the duration implicit cost in construction project. Through analyzing the similar characteristics of the technique of project network diagram and neural network, it built a duration implicit cost control model based on neural network, which can adjust the project network diagram to the optimization direction. Aiming at the defects of the traditional neural network, the variable learning rate back-propagation arithmetic and the additional momentum method were introduced, and the duration implicit cost control model was built, improving the accuracy of the control for the neural network technique.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

365-369

Citation:

Online since:

October 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Hua Ke, Weimin Ma, Yao Ni. Optimization models and GA-based algorithm for stochastic time-cost trade-off problem[J]. Applied Mathematics and Computation, 2009, 215: 308-313.

DOI: 10.1016/j.amc.2009.05.004

Google Scholar

[2] Chasabi-Oskoei H, Mahdavi-Amiri N. A efficient simplified neural network for solving linear and quadratic programming problems[J]. Applied Mathematics and Computation, 2006, 175: 452-464.

DOI: 10.1016/j.amc.2005.07.025

Google Scholar

[3] SunRui. Study of construction project cost management control method in the time limit[J]. Construction & Design for Project, 2012, (8): 209-212.

Google Scholar

[4] Shang Shanshan, You Jianxin. Quality Cost control model based on fuzzy neural network[J]. Soft Science, 2009, 23(12): 39-44.

Google Scholar

[5] Wang Yongsheng, Liang Changyong, Jiang Liying. Optimization modeling and solution about discrete time-cost trade-off problem in non-rhythm flow process with multi-project condition[J]. Journal of Engineering Management, 2010, 24(2): 156-159.

Google Scholar

[6] W.D. Yu, C.C. Lai, Lee. A WICE approach to real-time construction cost estimation. Automation in Construction, 2006, 15(1): 12-19.

DOI: 10.1016/j.autcon.2005.01.005

Google Scholar

[7] Ranjbar, M. etal. Ahybrid scatter search for the discrete time/resource trade-off. European Journal of Operational Research(2007), oi: 10. 1016/j. ejor. 2007. 10. 042.

Google Scholar

[8] ohammad R. Ranjbar, Fereydoon Kianfar. Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms[J]. Applied Mathematics and Computation. 191(2007): 451-456.

DOI: 10.1016/j.amc.2007.02.109

Google Scholar

[9] V. Tiwari, J.H. Pattersonand V.A. Mabert. Scheduling projects with heterogeneous resources to meet time and quality objectives[J]. European Journal of Operational Research. 193(3): 780-790.

DOI: 10.1016/j.ejor.2007.11.005

Google Scholar