Dynamic Scheduling Method for Steelmaking-Continuous Casting

Abstract:

Article Preview

A method of dynamic scheduling of steelmaking-continuous casting is proposed, which includes static scheduling based on genetic algorithm and dynamic scheduling based on scheduling rules, mathematical model and complete rescheduling utilizing genetic algorithm. The simulation with eight hours’ production data in S steel plant showed that the method could draw quickly a high quality and performable dynamic scheduling plan according to random production disturbance. The average utilization rate of converter could reach 95% and the generation period of initial scheduling is less than 3 minutes. The max dynamic scheduling adjustment period did not exceed 1 minute.

Info:

Periodical:

Edited by:

Ran Chen

Pages:

2162-2167

DOI:

10.4028/www.scientific.net/AMM.44-47.2162

Citation:

D. F. He et al., "Dynamic Scheduling Method for Steelmaking-Continuous Casting", Applied Mechanics and Materials, Vols. 44-47, pp. 2162-2167, 2011

Online since:

December 2010

Export:

Price:

$35.00

In order to see related information, you need to Login.