Risk Assessment of Power Transformer Based on FTA, FAHP and GA

Article Preview

Abstract:

The reliability of power transformer is very important to the safe operation of the power system. So a new method for power transformer risk assessment based on FTA, FAHP and GA is proposed. The method firstly establishes the power transformer fault tree; Secondly, it analyzes the fault tree through Fuzzy Analytic Hierarchy Process and constructs the fuzzy judgment matrix on transformer fault factors; Finally, it changes the question of solving the weight coefficients of each factor into a mathematical programming problem, and uses Genetic Algorithms to get the result so as to obtain the transformer reliability. In addition, the application result shows the effectiveness of the method above.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2274-2277

Citation:

Online since:

October 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Peng Sun and Shaohui Chen: Risk Matrix Model of Transformer Based on Failure Rate and Importance of Equipment (Forum on Electric Power Tech, Yunnan, China, 2011).

Google Scholar

[2] Tong Wu, Guangu Tu, Z. Q. Bo and A. Klimek: Fuzzy Set Theory and Fault Tree Analysis based Method Suitable for Fault Diagnosis of Power Transformer (International Conference on Intelligent Systems Applications to Power Systems, Taiwan, 2007).

DOI: 10.1109/isap.2007.4441664

Google Scholar

[3] S. S. Agarwal and M. L. Kansal: Fuzzy fault tree analysis of a power transformer (International Conference on Quality, Reliability, Risk, Maintenance, and Safety Engineering, Sichuan, China, 2012).

DOI: 10.1109/icqr2mse.2012.6246393

Google Scholar

[4] Youyuan Wang, Jingjing Zhou, Weigen Chen, Lin Du, Rengang Chen, Liang Zhang and Weiguang Song: Study of an Assessment Method for the Reliability of Tap-changers in Power Transformer Based on Fault-Tree Analysis (International Conference on High Voltage Engineering and Application, Chongqing, China, 2008).

DOI: 10.1109/ichve.2008.4774008

Google Scholar

[5] H. Boudali, P. Crouzen and M. Stoelinga: IEEE Transactions on Dependable and Secure Computing, Vol. 7 (2010), pp.128-143.

DOI: 10.1109/tdsc.2009.45

Google Scholar

[6] Yucheng Dong, Weichiang Hong, Yingfeng Xu, and Shui Yu: IEEE Transactions on Fuzzy Systems,  Vol. 19 (2011), p.13.

Google Scholar

[7] Jianjun Xu, Limei Yan, Jinlan Gao and Juan Chen: Selecting location of transformer substation based on FAHP (Chinese Control and Decision Conference, Yantai, China, 2008).

DOI: 10.1109/ccdc.2008.4597661

Google Scholar

[8] Weiguo Li, Qian Yu and Richeng Luo: Journal of Central South University, Vol. 4 (2012), p.982.

Google Scholar

[9] Shouyi Yu and Suqiong Kuang: Journal of Central South University of Technology, Vol. 1 (2010), p.123.

Google Scholar

[10] M. Wang, A. J. Vandermaar and K.D. Srivastava: IEEE Electrical Insulation Magazine, Vol. 18 (2002), p.12.

Google Scholar