Research on Wind Power Integration Capacity of Hydro-Thermal Wind Power System with Energy Storage System

Article Preview

Abstract:

With the fast development of clean energy in China, the conflict between limited peak load regulation capability and the increasing installed wind power capacity became more and more obvious. Two different wind power integration dispatching modes were proposed in this paper, meanwhile, the wind power integration capacity and system economy under different scenarios, which have different wind power penetration and energy storage system (ESS) capacity, were also analyzed. As indicated in the example analysis, the ESS can significantly enhance the wind power integration capacity; and the economical wind power integration dispatching mode is the most suitable choice for the power grid in wind-rich area.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2309-2315

Citation:

Online since:

October 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Sun Rongfu, Zhang Tao, Liancg Ji. Evaluation and Application of Wind Power Integration Capacity in Power Grid[J]. Automation of Electric Power Systems, 2011, Vol (04): 70-76.

Google Scholar

[2] Khatibi M, Jazaeri M. An Analysis for Increasing the Penetration of Renewable Energies by Optimal Sizing of Pumped-Storage Power Plants[M]. New York: Ieee, 2008: 195-199.

DOI: 10.1109/epc.2008.4763324

Google Scholar

[3] Ming-Shun L, Chung-Liang C, Wei-Jen L, etal. Combining the Wind Power Generation System With Energy Storage Equipment[J]. Industry Applications, IEEE Transactions on, 2009, Vol 45(6): 2109-2115.

DOI: 10.1109/tia.2009.2031937

Google Scholar

[4] Hongyu Zhang, Yonghua Yin, Hong Shen, etal. Peak-Load Regulating Adequacy Evaluation Associated with Large-Scale Wind Power Integration[J]. Proceedings of the CSEE, 2011, Vol 31(22): 26-31. (In Chinese).

Google Scholar

[5] Feng Li, Lizi Zhang. Study on Trans-Provincial Large-Scale Wind Power Accommodation and Transaction Mechanism[J]. Electric Power Automation Equipment, 2013, Vol 33(8): 119-124. (In Chinese).

Google Scholar

[6] Lizi Zhang, Feng Li, Shijun Cheng, etal. Research on Ancillary Services Requirements of Large-Scale Intermittent Energy[J]. Acta Energiae Solaris Sinica, 2013, Vol 34(8): 1345-1352. (In Chinese).

Google Scholar

[7] Lidong Yi, Minyi Zhu, Lei Wei, etal. A Computing Method for Peak Load Regulation Ability of Northwest China Power Grid Connected With Large-Scale Wind Farms[J]. Power System Technology, 2010, Vol (02): 129-132. (In Chinese).

Google Scholar

[8] Ning Zhang, TianRui Zhou, ChangGang Duan, etal. Impact of Large-Scale Wind Farm Connecting With Power Grid on Peak Load Regulation Demand[J]. Power System Technology, 2010, Vol (01): 152-158. (In Chinese).

Google Scholar

[9] Xindong Liu, Ke Fang, HuanYuan Chen, etal. Research on Rational Wind Power Casting Theory for Large-Scale Wind Power Integration Improvement[J]. Power System Protection and Control , 2012, Vol (06): 35-39. (In Chinese).

Google Scholar

[10] Zhiming Wang, Anlong Su, Shun Lu. Analysis on Capacity of Wind Power Integrated into Liaoning Power Grid Based on Power Balance[J]. Automation of Electric Power Systems, 2010, Vol 24(3): 86-90. (In Chinese).

Google Scholar

[11] Lidong Yi, Minyi Zhu, Lei Wei. A Computing Method for Peak Load Regulation Ability of Northwest China Power Grid Connected with Large-Scale Wind Farms[J]. Power System Technology, 2010, Vol 34(2): 129-132. (In Chinese).

Google Scholar

[12] Chen C L. Optimal wind-thermal generating unit commitment[J]. IEEE Trans on Energy Conversion, 2008, Vol 23(1): 273-280.

DOI: 10.1109/tec.2007.914188

Google Scholar

[13] Kazarlis SA, Bakirtzis AG, Petridis V. A genetic algorithm solution to the unit commitment problem[J]. Power Systems, IEEE Transactions on, 1996, Vol 11(1): 83-92.

DOI: 10.1109/59.485989

Google Scholar

[14] Lizi Zhang, Na Zhou, Nan Wang. Econimic comparison for different generation schedulings with large scale wind power connected power system[J]. Automation of Electric Power Systems, 2011, Vol (22): 105-110. (In Chinese).

Google Scholar