Study of FIDIC Condition in Innovative Engineering Environment

Article Preview

Abstract:

The FIDIC Condition has been widely applied in the international engineering. The practice applying in foreign-invested projects in China indicates it can speed up the process of standardization of construction project management and improve the level of construction project management. However, because of constraints of various factors, the application of the FIDIC Conditions is limited in China. This paper describes the questions of application and the measures to be taken currently.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

531-534

Citation:

Online since:

January 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Zhang Shuibo, Pang Dinghui (2001) Features and Applications of New Edition of FIDIC Conditions of Contract., China Harbor Engineering 1(5): 585-589.

Google Scholar

[2] Zhao Zhenyu, Jiang Wei, Huang Wenjie. (2003) Contractor's Risks in the FIDIC 1999 Conditions of Contract for Construction., China Civil Engineering Journal 2(3): 5-17.

Google Scholar

[3] Mu Fei, He Rui. (2009) Application of Price Adjustment Formulae in International Engineering Contracts, Construction Economy3(6): 189-197.

Google Scholar

[4] Shen Wei. (2010) Research of Engineering Claim Based on the FIDIC Contract Conditions, China Economist 4(6): 363-376.

Google Scholar

[5] Wang Kai, Guo Bin, Yan Jinbing (2011) Claim for Time of Extension under FIDIC Conditions due to Delay in Interim Payments., China Harbour Engineering 5(8): 259-274.

Google Scholar

[6] Bian Yiyang, Zhan Binggen (2011) Comparative Analysis of FIDIC Consultation Selection and China's bidding of Supervision., Construction Economy 6(7): 257-271.

Google Scholar

[7] Li Chengye (2011) Orientation and Responsibility of Consulting Engineer under the FIDIC Contract Condition., Construction Economy 7(11): 360-369.

Google Scholar

[8] Wu Weidong, Zheng Junwei. (2012) Talking about Bid Quote for International Engineering under FIDIC Contract Conditions, Construction Economy 8(4): 429-434.

Google Scholar

[9] Ju Wei. (2012) Application of FIDIC Contract in the First-stage Project of the Shanghai Rail Transit No. 9 Line. , Value Engineering 9(5): 685-689.

Google Scholar

[10] Zha Jingmin, Dong Xiang (2006) The Comparison on the Engineer's Responsibility between FIDIC and the "Chinese Contract Condition"., 13th International Conference on Industrial Engineering and Engineering Management vol. 4 10(3): 1155-117.

Google Scholar

[11] Hillel A. Iain (2009) The Consequences of Belated Determination of Extension Claims Under FIDIC Contracts., Cost engineering 11(6): 289-297.

Google Scholar

[12] John Boyd, Jorge Diaz Padilla (2009) FIDIC and Integrity: A Status Report., Leadership and management in engineering 12(3): 215-217.

Google Scholar