ZPW2000 Rail Transmission Network of Compensation Capacitor Analysis and Ponder

Article Preview

Abstract:

In order to better research and design track circuit system, this paper analysis and calculated compensation capacitor of the ZPW2000 no insulation track circuit, and verified the consistency of the experimental results and the practical installation situation. Analysis results also show that, through the appropriate compensation capacitor, the no insulation track circuit transmission distance significantly increased.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1473-1476

Citation:

Online since:

February 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] LuoHaiTao. Shift frequency automatic block. Beijing: China railway publishing. (1992).

Google Scholar

[2] LinYuJun. Interval signal automatic control. Beijing: China railway publishing. (2008).

Google Scholar

[3] Zhang Tiezeng. Train Operation Control System[M]. Beijing: China railway publishing. (2011).

Google Scholar

[4] JiaChenZi. Track circuit parameters measurement and adjust [D]. Beijing: the north traffic university. (2007).

Google Scholar

[5] YuanYan. Track circuit modeling and simulation [D]. Chengdu: University of electronic science and technology. (2005).

Google Scholar